Bathroom Renovation - A Step by Step Guide
Bathrooms are some of the smallest rooms in the house plus they are also the most expensive to renovate. Bathroom renovation can be a job that, if done well, can also add value with a home as well as a great space filled with design and light-weight.
Bathroom design
Bathroom design will be the first area of your bathrooms renovation you need to get right. Just replacing the existing bathroom with the exact same design might not be enough. The key to great bathroom design is to design it with all the individuals who are going to utilize it planned. However be sure that your bathroom design also offers a broad use factor too.
For example: If you were designing a bath room for families you can still design the bathroom with comfortable access towards the shower and bath. This would make certain that the design would work if you have limited mobility. This means if you opt to sell your home or if you're renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, considering the lighting or window space, height and width of fittings, and drainage options. Draw out a plan to scale and right down the sizes of the room. Mark the prevailing drainage points and then and water inlet points. Write down a wish report on the toilet fittings to want and wish using sizes. Now marry the 2 together to see what fits. Note: Most bathroom drainage and water inlet points might be moved but this does come at extra cost.
Bathroom remodel
If you've decided to perform the work yourself or part of the work it really is time to employ a skip bin and retrieve the existing bathroom. If your home is made pre 1980 you could have fibro bathroom wall linings with asbestos inside and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council about the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you will not have to turn the river off for your house. Also you will have to jack hammer the ground tiles up and the sand and cement bed actually laid on.
Bathroom Renovation and construction
Bathrooms should be construction properly in the ground up to be sure that the finished job is correct and true. This also ensures the style and appear of the restroom could have a fantastic finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling then install the bath hob and bath.
Waterproof the bottom and shower and bath recess.
Correct the fall of a floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling then install the bath hob and bath.
Waterproof the bottom and shower and bath recess.
Correct the fall of a floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Paint ceiling and final one - Plumbing and electrical
At this aspect all new plumbing is installed for clean cold and hot water and drainage. Careful attention needs to be taken when positioning the new plumbing so that the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you should consider the thickness from the wall board, tile glue and tile hence the fitting is going to be centred following your tiles are available. The same relates to installing drainage pipes for any toilet; the wall lining and tile thickness has to be looked at therefore the pipe is in the correct position once the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them towards the mains power.
Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout onto your new wall board with a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard could be the most common. However if you happen to be laying your tiles from floor to ceiling usually do not install the cornice because most effectively achieved after tiling. If you happen to be not tiling towards the ceiling go ahead and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is just not freestanding now you can make up the frame and install the bathtub. Ensure the tub is installed correctly permitting the thickness with the tiles and sure to test all linings and pipes prior to deciding to continue with your bathroom renovation.
Insider Modern Home Office Desks Furniture For Contemporary Design Cuttingedgeredlands best
Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess will need to be waterproofed 100mm higher than the shower rose outlet. Also the bathtub needs to be waterproofed 100mm over the lip in the bath about and towards the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, so the all water is only going to go down a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay inside the cement screed for the bottom.
Before the bottom tiles can laid the ground has to be smooth and fairly flat which has a slight fall for the drainage outlet. To do this you have to use sand and cement mix in fact it is advisable to give a waterproofing agent into this as well. With a level, set the ground level with the doorway. Use the top aluminum angle as the finished floor level and measure around the thickness in the tile plus 10mm for the glue. Mark right around the bathroom which has a level and after that screed in your sand and cement mix with a 1 to 3 degree fall for the top of the drain outlet. Take your time and get it right using the finished level as smooth as you possibly can. When the sand cement mix has set but isn't dry (you can walk into it however you it's still somewhat soft) rub it over with a house brick. This will remove each of the small highs and lows and appearance with a level when you go. Let the toilet floor fully dry then you must have a fantastic surface to tile onto. Tip: the greater work you add into the bottom screed the more your tiling is going to be.
1 Contemporary Furniture Modern Office
Step five: Tile floor and walls
Lay your tiles on the ground first and after that grout. Then lay your wall tiles ensuring that that they are level while you lay. Once the lavatory tiles happen to be cut and laid, grout all your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your new bathroom vanity ensuring it really is level and sealed around the top with silicone and also seal around the bath. Tip: make sure they have been in the right place before you decide to drill in your tiles.
Modern Home Offices HGTV
Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making sure everything is fitted correctly and that there won't be any leaks within your plumbing. - Enjoy your new bathroom.