Bathroom Renovation - A Step by Step Guide
Bathrooms are some of the smallest rooms at home and they are generally also certainly the most expensive for renovate. Bathroom renovation is often a job that, if done well, can also add value to some home as well as a great space filled with design and lightweight.
Bathroom design
Bathroom design may be the first section of a bath room renovation you need right. Just replacing the current bathroom with the same design will not be enough. The key to great bathroom design would be to design it with the people that will certainly utilize it at heart. However be sure that a bath room design even offers an over-all use factor as well.
For example: If you were designing your bathrooms for families you may still design the toilet with easy access to the shower and bath. This would ensure that the look would also work if you have limited mobility. This means if you decide to sell your property or if you're renovating for profit your design includes a wider market appeal. Great bathroom design also uses space well, considering the sunshine or window space, sized fittings, and drainage options. Draw out a strategy to scale and down the sizes of your room. Mark the prevailing drainage points and after that and water inlet points. Write down a wish report on the bathroom fittings to want and need using their sizes. Now marry both the together to see what fits. Note: Most bathroom drainage and water inlet points may be moved but this certainly does come at extra expense.
Bathroom remodel
If you decide to perform the work yourself or part of the work it really is time to engage a skip bin and retrieve that old bathroom. If your house appeared pre 1980 you may have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing in position you won't ought to turn the river off for your house. Also you should jack hammer a floor tiles up along with the sand and cement bed actually laid on.
Bathroom Renovation and construction
Bathrooms has to be construction properly in the ground up to ensure that the finished job is correct and true. This also ensures the look and look of the lavatory may have an incredible finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and after that install the bath hob and bath.
Waterproof the floor and shower and bath recess.
Correct nov the ground with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and after that install the bath hob and bath.
Waterproof the floor and shower and bath recess.
Correct nov the ground with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Paint ceiling and final one - Plumbing and electrical
At this aspect many new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing in order that the plumbing fittings are correct when the tiling is finished. For example: To centre a fitting in a shower recess you should consider the thickness in the wall board, tile glue and tile so the fitting will be centred after the tiles are in position. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into account therefore the pipe is incorporated in the correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board having a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling tend not to install the cornice because best done after tiling. If you're not tiling on the ceiling go ahead and install the cornice following your wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding now you can from the frame and install the tub. Ensure the tub is installed correctly making it possible for the thickness in the tiles and sure to check on all linings and pipes prior to deciding to continue with your bathrooms renovation.
15 best images about Outdoor wall on Pinterest Cheap privacy fence, Extension ideas and
Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing the bottom make certain that the waterproofing comes 100mm in the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the bathtub should be waterproofed 100mm higher than the lip of the bath around and on the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will only drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most significant.
Step four - Lay inside the cement screed for the bottom.
Before a floor tiles can laid the bottom has to be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you should use sand and cement mix and it's also advisable to put in a waterproofing agent into this as well. With a level, set a floor level with the doorway. Use the top aluminum angle because the finished floor level and measure on the thickness from the tile plus 10mm to the glue. Mark about the toilet using a level and then screed with your sand and cement mix with a 1 to 3 degree fall for the top of the drain outlet. Take your time and have it right using the finished level as smooth as you possibly can. When the sand cement mix has set but just isn't dry (you'll be able to walk into it however, you it is a bit soft) rub it over which has a house brick. This will remove all the small highs and lows and check using a level when you go. Let the bathroom floor fully dry and after that you really should have a fantastic surface to tile onto. Tip: the greater work you set into a floor screed the simpler your tiling will probably be.
Brick Patio Screen Wall Craftsman Exterior San Diego by Tidwell Masonry
Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles making certain they are level when you lay. Once the bathroom tiles are actually cut and laid, grout all your tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your bathroom vanity making sure it can be level and sealed around the top with silicone and in addition seal around the bathtub. Tip: make sure they are in the right place before you drill into the tiles.
15 best images about Outdoor wall on Pinterest Cheap privacy fence, Extension ideas and
Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean making sure things are fitted correctly understanding that there won't be any leaks inside your plumbing. - Enjoy your brand-new bathroom.