Bathroom Renovation - A Step by Step Guide
Bathrooms are among the smallest rooms in the house and they are also certainly the most expensive to renovate. Bathroom renovation can be a job that, if done well, can also add value to some home plus a great space brimming with design and lightweight.
Bathroom design
Bathroom design is the first division of a bath room renovation you need right. Just replacing the prevailing bathroom with similar design may not be enough. The key to great bathroom design is to design it with the folks that are going to apply it planned. However make sure that your bathrooms design boasts an overall use factor too.
For example: If you were designing your bathroom for families you can still design the toilet with quick access towards the shower and bath. This would make sure that the look would recieve treatment for those who have limited mobility. This means if you sell your home or if you are renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, looking at the sunshine or window space, size fittings, and drainage options. Draw out a strategy to scale and down the sizes of one's room. Mark the prevailing drainage points and then and water inlet points. Write down a wish report on the toilet fittings to need and wish with their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this does come at extra cost.
Bathroom remodel
If you've decided to accomplish the project yourself or part of the work it's time to work with a skip bin and pull out the existing bathroom. If your own home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the lavatory plumbing in position you do not need to turn the lake off for your house. Also you will likely need to jack hammer the floor tiles up and the sand and cement bed that they're laid on.
Bathroom Renovation and construction
Bathrooms should be construction properly from your ground up to be sure that the finished job is correct and true. This also ensures the style and appearance of the bathroom will have an excellent finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling then install the tub hob and bath.
Waterproof a floor and shower and bath recess.
Correct late a floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling then install the tub hob and bath.
Waterproof a floor and shower and bath recess.
Correct late a floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Paint ceiling and final one - Plumbing and electrical
At this aspect all new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the brand new plumbing so that the plumbing fittings are correct when the tiling is completed. For example: To centre a fitting in a very shower recess you must consider the thickness of the wall board, tile glue and tile hence the fitting will probably be centred as soon as the tiles are in place. The same relates to installing drainage pipes for a toilet; the wall lining and tile thickness must be looked at so the pipe is within the correct position if the toilet is installed after tiling. Also rough within the any new electrical wires without connecting them to the mains power.
Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the modern pipes and electrical wires. The best way is always to measure and mark the pipe and wire layout on your new wall board having a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you might be laying your tiles from floor to ceiling usually do not install the cornice because this is best done after tiling. If you happen to be not tiling for the ceiling go on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath just isn't freestanding you can now make up the frame and install the tub. Ensure the tub is installed correctly permitting the thickness of the tiles and sure to test all linings and pipes before you decide to continue with a bath room renovation.
10 Ways to Correct Your Interior Design Color Myths Freshome.com
Step three - Waterproof your bathroom
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing the bottom ensure that the waterproofing comes 100mm the walls. The shower recess must be waterproofed 100mm above the shower rose outlet. Also the tub needs to be waterproofed 100mm above the lip from the bath around and towards the floor. At the doorway purchase a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will simply go lower a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most important.
Step four - Lay inside cement screed for the floor.
Before the bottom tiles can laid the ground must be smooth and fairly flat which has a slight fall to the drainage outlet. To do this you must use sand and cement mix in fact it is far better to give a waterproofing agent into this also. With a level, set a floor level in the doorway. Use the top aluminum angle since the finished floor level and measure down the thickness from the tile plus 10mm for your glue. Mark about the restroom with a level after which screed within your sand and cement mix having a 1 to 3 degree fall on the top in the drain outlet. Take your time and obtain it right using the finished level as smooth as is possible. When the sand cement mix has set but isn't dry (you are able to walk into it however, you it's still a little soft) rub it over which has a house brick. This will remove each of the small highs and lows and check having a level when you go. Let the bathroom floor fully dry and after that you really should have an incredible surface to tile onto. Tip: the more work you place into a floor screed the simpler your tiling will likely be.
Summer Thornton Design Chicagos Best Interior Designer
Step five: Tile floor and walls
Lay your tiles on a floor first and then grout. Then lay your wall tiles ensuring that they are level while you lay. Once the lavatory tiles happen to be cut and laid, grout all of your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your entire plumbing fittings and taps. Also fit your entire towel rails and soap holders. Fit your new bathroom vanity making sure it really is level and sealed around the top with silicone and also seal around the tub. Tip: make sure they come in the right place before you decide to drill in your tiles.
25 Stunning Home Interior Designs Ideas – The WoW Style
Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring that it is all totally fitted correctly and that there won't be any leaks within your plumbing. - Enjoy your brand-new bathroom.