Bathroom Renovation - A Step by Step Guide
Bathrooms are among the smallest rooms in the home and they're also certainly the most expensive to renovate. Bathroom renovation is really a job that, if done well, can also add value to your home and a great space full of design and light-weight.
Bathroom design
Bathroom design may be the first section of your bathrooms renovation you should get right. Just replacing the prevailing bathroom with the same design will not be enough. The key to great bathroom design is to design it using the folks that will certainly put it to use in mind. However make certain that a bath room design boasts an overall use factor too.
For example: If you were designing your bathrooms for families you may still design the restroom with quick access to the shower and bath. This would ensure that the structure would also work if you have limited mobility. This means if you decide to sell your own home or if you might be renovating for profit your design has a wider market appeal. Great bathroom design also uses the room well, considering the lighting or window space, sized fittings, and drainage options. Draw out a plan to scale and right down the sizes of the room. Mark the present drainage points after which and water inlet points. Write down a wish listing of the lavatory fittings to wish and wish making use of their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points may be moved but this will come at expense.
Bathroom remodel
If you have chosen to complete the project yourself or part of the task it can be time to hire a skip bin and pull out the old bathroom. If your own home appeared pre 1980 you might have fibro bathroom wall linings with asbestos inside and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you will not ought to turn water off for the whole house. Also you will likely need to jack hammer the floor tiles up and also the sand and cement bed that they're laid on.
Bathroom Renovation and construction
Bathrooms have to be construction properly in the ground-up to make certain that the finished job is correct and true. This also ensures the style and appear of the restroom can have an excellent finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and after that install the bathtub hob and bath.
Waterproof a floor and shower and bath recess.
Correct the fall of the floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and after that install the bathtub hob and bath.
Waterproof a floor and shower and bath recess.
Correct the fall of the floor with sand and cement ready for tiling.
Lay floor and wall tiles and then grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Paint ceiling and final one - Plumbing and electrical
At this aspect new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the new plumbing so that the plumbing fittings are correct if the tiling ends. For example: To centre a fitting inside a shower recess you have to take into consideration the thickness in the wall board, tile glue and tile so the fitting will probably be centred following your tiles are available. The same refers to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into consideration hence the pipe influences correct position in the event the toilet is installed after tiling. Also rough inside any new electrical wires without connecting them to the mains power.
Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board which has a pencil while you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because this is most effectively achieved after tiling. If you're not tiling on the ceiling just install the cornice following the wallboard and ceiling lining happen to be installed. Also if your bath just isn't freestanding now you can make up the frame and install the bathtub. Ensure the tub is installed correctly enabling the thickness from the tiles and sure to test all linings and pipes prior to deciding to continue with a bath room renovation.
Best 25+ One room flat ideas on Pinterest Studio living, Studio apartments and Living room
Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bath. When waterproofing a floor make certain that the waterproofing comes 100mm inside the walls. The shower recess will have to be waterproofed 100mm above the shower rose outlet. Also the tub should be waterproofed 100mm across the lip from the bath right around and for the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, hence the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most critical.
Step four - Lay in the cement screed for the bottom.
Before the floor tiles can laid the floor has to be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you have to use sand and cement mix and it's also best to give a waterproofing agent into this at the same time. With a level, set the floor level with the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness of the tile plus 10mm to the glue. Mark around the lavatory which has a level and after that screed inside your sand and cement mix having a 1 to 3 degree fall to the top in the drain outlet. Take your time and get it right using the finished level as smooth as you can. When the sand cement mix has set but isn't dry (you are able to walk about it however you it is a bit soft) rub it over with a house brick. This will remove all of the small highs and lows and look having a level when you go. Let the lavatory floor fully dry then you must have a great surface to tile onto. Tip: greater work you put into a floor screed the simpler your tiling will be.
The Best Tips For Decorating A Small Studio Apartment / design bookmark 13465
Step five: Tile floor and walls
Lay your tiles on the ground first and then grout. Then lay your wall tiles ensuring that they are level as you lay. Once the bathroom tiles have been cut and laid, grout all your tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your bathroom vanity ensuring it's level and sealed round the top with silicone plus seal around the bath. Tip: make sure they have been in the right place before you drill to your tiles.
25个一居室户型装修3D布局效果图 设计之家
Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are fitted correctly knowning that there won't be any leaks with your plumbing. - Enjoy your bathroom.