Bathroom Renovation - A Step by Step Guide

Bathrooms are probably the smallest rooms inside your home plus they are also one the most costly to renovate. Bathroom renovation is often a job that, if done well, will add value to some home plus a great space brimming with design and light.
false ceiling designs for bedroom  20 ideas

Bathroom design
Bathroom design may be the first section of your bathroom renovation you need to get right. Just replacing the prevailing bathroom with the exact same design might not be enough. The key to great bathroom design is to design it with the individuals who will certainly apply it planned. However make sure that your bathroom design boasts a general use factor at the same time.

For example: If you were designing your bathrooms for families you may still design the restroom with quick access to the shower and bath. This would make sure that the look would work for those who have limited mobility. This means if you decide to sell your property or if you are renovating for profit your design carries a wider market appeal. Great bathroom design also uses the area well, taking into consideration the sunshine or window space, size fittings, and drainage options. Draw out an agenda to scale and right down the sizes of one's room. Mark the existing drainage points after which and water inlet points. Write down a wish list of the restroom fittings to require and want using their sizes. Now marry both the together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this will come at extra cost.
Light up your home with this peaceful  serene white coloured Gyproc India ‪‎falseceiling

Bathroom remodel
If you decide to accomplish the project yourself or part of the task it really is time to hire a skip bin and retrieve the old bathroom. If your home was developed pre 1980 you could have fibro bathroom wall linings with asbestos inside it and great care will have to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your neighborhood building authority or council concerning the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the bathroom plumbing set up you do not have to turn the water off for the complete house. Also you will have to jack hammer a floor tiles up and the sand and cement bed actually laid on.
False Ceiling Designs for Bedrooms: 9 Ideas You Will Love

Bathroom Renovation and construction
Bathrooms must be construction properly in the start to be sure that the finished job is correct and true. This also ensures the structure and look of the restroom will have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the tub hob and bath.

Waterproof the floor and shower and bath recess.

Correct the fall of the floor with sand and cement ready for tiling.

Lay floor and wall tiles and then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
30 false ceiling designs for bedroom, kitchen and dining room


Paint ceiling and final  one - Plumbing and electrical
At now new plumbing is installed for clean cold and hot water and drainage. Careful attention should be taken when positioning the modern plumbing in order that the plumbing fittings are correct when the tiling is finished. For example: To centre a fitting in the shower recess you must take into account the thickness in the wall board, tile glue and tile and so the fitting is going to be centred as soon as the tiles are in place. The same applies to installing drainage pipes to get a toilet; the wall lining and tile thickness must be taken into consideration and so the pipe influences correct position when the toilet is installed after tiling. Also rough in the any new electrical wires without connecting them on the mains power.
fall ceiling designs catalog

Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is to measure and mark the pipe and wire layout onto your new wall board with a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you happen to be laying your tiles from floor to ceiling don't install the cornice as this is done after tiling. If you're not tiling to the ceiling proceed to install the cornice as soon as the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now make up the frame and install the tub. Ensure the tub is installed correctly making it possible for the thickness with the tiles and  sure to test all linings and pipes before you decide to continue with your bathroom renovation.

Light up your home with this peaceful serene white coloured Gyproc India ‪‎falseceiling
false ceiling designs for bedroom  20 ideas

Step three - Waterproof a bath room
Waterproof a bath room floor, shower recess, and around the bathtub. When waterproofing the floor make sure that the waterproofing comes 100mm in the walls. The shower recess will have to be waterproofed 100mm across the shower rose outlet. Also the tub needs to be waterproofed 100mm above the lip in the bath around and to the floor. At the doorway put in a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, and so the all water will simply drop a drain. Bathroom waterproofing tip: waterproofing is a simple job but quality and accuracy is most crucial.
Step four - Lay in the cement screed for the bottom.

Before the floor tiles can laid a floor must be smooth and fairly flat with a slight fall towards the drainage outlet. To do this you have to use sand and cement mix which is far better to include a waterproofing agent into this at the same time. With a level, set the ground level on the doorway. Use the top aluminum angle because the finished floor level and measure down the thickness from the tile plus 10mm for your glue. Mark around the restroom which has a level and after that screed inside your sand and cement mix having a 1 to 3 degree fall on the top in the drain outlet. Take your time and acquire it right with all the finished level as smooth as possible. When the sand cement mix has set but is not dry (you can walk into it nevertheless, you will still be somewhat soft) rub it over with a house brick. This will remove every one of the small highs and lows and appearance using a level while you go. Let the lavatory floor fully dry then you really should have an incredible surface to tile onto. Tip: the greater work you set into the floor screed the simpler your tiling will probably be.
False Ceiling Designs for Bedrooms: 9 Ideas You Will Love
Light up your home with this peaceful  serene white coloured Gyproc India ‪‎falseceiling

Step five: Tile floor and walls
Lay your tiles on a floor first then grout. Then lay your wall tiles making certain actually level when you lay. Once the lavatory tiles happen to be cut and laid, grout your tiles and then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install your plumbing fittings and taps. Also fit your towel rails and soap holders. Fit your brand-new bathroom vanity ensuring that it is level and sealed round the top with silicone and in addition seal around the tub. Tip: make sure they have been in the right place before you drill to your tiles.
30 false ceiling designs for bedroom, kitchen and dining room
False Ceiling Designs for Bedrooms: 9 Ideas You Will Love

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring that it is all totally fitted correctly knowning that there are no leaks with your plumbing. - Enjoy your brand-new bathroom.