Backyard Decking Designs Small Backyard Decks Backyard Deck Design Backyard Decking Designs Beautiful Small Wooden Deck Patio Ideas Small Backyard Deck Designs YouTube
Bathroom Renovation - A Step by Step Guide
Bathrooms are some of the smallest rooms in the home plus they are also the most expensive for renovate. Bathroom renovation is really a job that, if done well, may add value to your home as well as a great space packed with design and lightweight.
Bathroom design
Bathroom design will be the first division of a bath room renovation you ought to get right. Just replacing the present bathroom with the exact same design will not be enough. The key to great bathroom design would be to design it with the people that are likely to put it to use in mind. However ensure that your bathrooms design also has an over-all use factor too.
For example: If you were designing a bathroom for families you may still design the restroom with quick access to the shower and bath. This would ensure that the design would recieve treatment if you have limited mobility. This means if you sell your house or if you might be renovating for profit your design features a wider market appeal. Great bathroom design also uses space well, taking into account the lighting or window space, sized fittings, and drainage options. Draw out a strategy to scale and right down the sizes of one's room. Mark the present drainage points and then and water inlet points. Write down a wish report on the bathroom fittings to want and wish making use of their sizes. Now marry both the together and see what fits. Note: Most bathroom drainage and water inlet points could be moved but this may come at extra cost.
Bathroom remodel
If you have decided to perform the task yourself or part of the job it's time to engage a skip bin and retrieve that old bathroom. If your home is made pre 1980 maybe you have fibro bathroom wall linings with asbestos inside it and great care should be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing available you do not must turn the water off for your house. Also you will have to jack hammer the floor tiles up and the sand and cement bed they are laid on.
Bathroom Renovation and construction
Bathrooms have to be construction properly from your start to make sure that the finished job is correct and true. This also ensures the look and appear of the bathroom can have a fantastic finish
The Bathroom Renovation Process
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and then install the bath hob and bath.
Waterproof the bottom and shower and bath recess.
Correct the fall of the ground with sand and cement ready for tiling.
Lay floor and wall tiles and after that grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Install water and drainage pipe and electrical wires.
Install wall lining and ceiling and then install the bath hob and bath.
Waterproof the bottom and shower and bath recess.
Correct the fall of the ground with sand and cement ready for tiling.
Lay floor and wall tiles and after that grout.
Install new bathroom vanity, fittings, and taps - install new electrical.
Paint ceiling and final one - Plumbing and electrical
At this point new plumbing is installed for clean cold and warm water and drainage. Careful attention has to be taken when positioning the newest plumbing so the plumbing fittings are correct once the tiling is finished. For example: To centre a fitting inside a shower recess you need to take into account the thickness of the wall board, tile glue and tile therefore the fitting will be centred following the tiles are set up. The same relates to installing drainage pipes to get a toilet; the wall lining and tile thickness must be looked at and so the pipe is incorporated in the correct position if the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
Step two - Install wall and ceiling linings
Install your 6mm wall lining fostering to nail the fibro board every 150mm without nailing into the brand new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board using a pencil because you go. Screw up (or nail) the ceiling lining, plasterboard is the most common. However if you're laying your tiles from floor to ceiling usually do not install the cornice because done after tiling. If you're not tiling for the ceiling go on and install the cornice following the wallboard and ceiling lining are already installed. Also if your bath isn't freestanding it's simple to from the frame and install the bath. Ensure the tub is installed correctly making it possible for the thickness of the tiles and sure to test all linings and pipes before you continue with a bath room renovation.
Image result for patio ideas on a budget pictures New Deck in 2019 Backyard patio designs
Step three - Waterproof a bath room
Waterproof your bathrooms floor, shower recess, and around the tub. When waterproofing the floor be sure that the waterproofing comes 100mm the walls. The shower recess should be waterproofed 100mm across the shower rose outlet. Also the tub needs to be waterproofed 100mm over the lip from the bath around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof in the lip. Your whole bathroom should now the tanked, so the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most important.
Step four - Lay within the cement screed for the bottom.
Before the bottom tiles can laid the bottom have to be smooth and fairly flat using a slight fall towards the drainage outlet. To do this you must use sand and cement mix in fact it is far better to add a waterproofing agent into this at the same time. With a level, set the bottom level on the doorway. Use the top aluminum angle because the finished floor level and measure along the thickness in the tile plus 10mm to the glue. Mark around the toilet using a level then screed in your sand and cement mix using a 1 to 3 degree fall towards the top in the drain outlet. Take your time and acquire it right while using finished level as smooth as possible. When the sand cement mix has set but isn't dry (it is possible to walk on it however, you it is a bit soft) rub it over with a house brick. This will remove every one of the small highs and lows and check having a level as you go. Let the bathroom floor fully dry and then you really should have an incredible surface to tile onto. Tip: the harder work you set into a floor screed the more your tiling will likely be.
20 Beautiful Backyard Wooden Patio Ideas
Step five: Tile floor and walls
Lay your tiles on a floor first after which grout. Then lay your wall tiles making certain that they are level because you lay. Once the restroom tiles happen to be cut and laid, grout your entire tiles after which buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit your new bathroom vanity ensuring that it's level and sealed throughout the top with silicone and in addition seal around the tub. Tip: make sure they come in the right place before you drill in your tiles.
17 Best ideas about Small Backyard Decks on Pinterest Back patio, Small outdoor patios and
Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform a final clean making sure things are fitted correctly which there aren't any leaks inside your plumbing. - Enjoy a new bathroom.
Comments
Post a Comment