Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the house plus they are also one the most expensive for renovate. Bathroom renovation is really a job that, if done well, can add value to some home plus a great space packed with design and lightweight.
Backyard, outdoor kitchen, pool,  in pool bar seating  Pool ideas  Pinterest  Kitchenettes

Bathroom design
Bathroom design is the first division of your bathroom renovation you ought to get right. Just replacing the present bathroom sticking with the same design may not be enough. The key to great bathroom design is always to design it with all the folks that are going to put it to use planned. However make certain that your bathrooms design boasts a broad use factor too.

For example: If you were designing your bathroom for families you can still design the restroom with easy accessibility to the shower and bath. This would be sure that the style would also work for those who have limited mobility. This means if you choose to sell your home or if you happen to be renovating for profit your design has a wider market appeal. Great bathroom design also uses space well, taking into account the sunshine or window space, height and width of fittings, and drainage options. Draw out an agenda to scale and down the sizes of your room. Mark the prevailing drainage points then and water inlet points. Write down a wish report on the lavatory fittings to need and wish with their sizes. Now marry the 2 together and find out what fits. Note: Most bathroom drainage and water inlet points might be moved but this certainly does come at extra expense.
25+ best ideas about Swimming pools on Pinterest  Swimming pools backyard, Swimming pool

Bathroom remodel
If you decide to complete the task yourself or part of the project it really is time to hire a skip bin and take out the existing bathroom. If your property was developed pre 1980 maybe you have fibro bathroom wall linings with asbestos in it and great care must be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with your local building authority or council regarding the regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the toilet plumbing available you will not have to turn the lake off for the whole house. Also you will have to jack hammer the ground tiles up and also the sand and cement bed they are laid on.
25+ Fabulous Small Backyard Designs with Swimming Pool  Architecture  Design

Bathroom Renovation and construction
Bathrooms must be construction properly through the ground up to make certain that the finished job is correct and true. This also ensures the style and look of the bathroom can have an incredible finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling after which install the bathtub hob and bath.

Waterproof the floor and shower and bath recess.

Correct nov the ground with sand and cement ready for tiling.

Lay floor and wall tiles after which grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
10 SwimUp Bars That, If You Had, Youd Never Want To Leave PHOTOS  HuffPost


Paint ceiling and final  one - Plumbing and electrical
At now all new plumbing is installed for clean cold and hot water and drainage. Careful attention must be taken when positioning the newest plumbing so your plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you should take into consideration the thickness from the wall board, tile glue and tile hence the fitting will be centred following the tiles are set up. The same pertains to installing drainage pipes to get a toilet; the wall lining and tile thickness have to be taken into consideration hence the pipe influences correct position once the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them to the mains power.
47 Outdoor Kitchen Designs and Ideas

Step two - Install wall and ceiling linings
Install your 6mm wall lining the constant maintenance to nail the fibro board every 150mm without nailing into the newest pipes and electrical wires. The best way is usually to measure and mark the pipe and wire layout on to your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard will be the most common. However if you're laying your tiles from floor to ceiling do not install the cornice because done after tiling. If you are not tiling to the ceiling just install the cornice following the wallboard and ceiling lining have been installed. Also if your bath is not freestanding it's simple to from the frame and install the tub. Ensure the bathtub is installed correctly allowing for the thickness in the tiles and  sure to evaluate all linings and pipes when you continue with your bathrooms renovation.

25+ best ideas about Swimming pools on Pinterest Swimming pools backyard, Swimming pool
Backyard, outdoor kitchen, pool,  in pool bar seating  Pool ideas  Pinterest  Kitchenettes

Step three - Waterproof your bathrooms
Waterproof your bathroom floor, shower recess, and around the bathtub. When waterproofing a floor be sure that the waterproofing comes 100mm the walls. The shower recess will have to be waterproofed 100mm over the shower rose outlet. Also the bathtub ought to be waterproofed 100mm higher than the lip with the bath about and towards the floor. At the doorway use a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof to the lip. Your whole bathroom should now the tanked, so the all water will simply decrease a drain. Bathroom waterproofing tip: waterproofing is a straightforward job but quality and accuracy is most critical.
Step four - Lay inside cement screed for the floor.

Before the ground tiles can laid the ground have to be smooth and fairly flat with a slight fall for the drainage outlet. To do this you should use sand and cement mix and it is best to give a waterproofing agent into this as well. With a level, set the bottom level on the doorway. Use the top aluminum angle as the finished floor level and measure along the thickness in the tile plus 10mm for that glue. Mark right around the toilet with a level and then screed inside your sand and cement mix with a 1 to 3 degree fall to the top in the drain outlet. Take your time and acquire it right with all the finished level as smooth as you can. When the sand cement mix has set but is not dry (it is possible to walk onto it however, you it's still a little soft) rub it over which has a house brick. This will remove each of the small highs and lows and appearance with a level while you go. Let the restroom floor fully dry after which you needs to have a great surface to tile onto. Tip: greater work you set into the bottom screed the easier your tiling will likely be.
25+ Fabulous Small Backyard Designs with Swimming Pool Architecture Design
25+ best ideas about Swimming pools on Pinterest  Swimming pools backyard, Swimming pool

Step five: Tile floor and walls
Lay your tiles on the bottom first and after that grout. Then lay your wall tiles making certain they are level because you lay. Once the toilet tiles are actually cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all your plumbing fittings and taps. Also fit all of your towel rails and soap holders. Fit a new bathroom vanity ensuring it's level and sealed around the top with silicone and in addition seal around the bath. Tip: make sure they will be in the right place prior to deciding to drill to your tiles.
10 SwimUp Bars That, If You Had, Youd Never Want To Leave PHOTOS HuffPost
25+ Fabulous Small Backyard Designs with Swimming Pool  Architecture  Design

Step seven: painting, and cleaning - enjoy
Paint your ceiling and perform final clean ensuring that it is all totally fitted correctly which there aren't any leaks with your plumbing. - Enjoy your bathroom.