20 Beautiful Backyard Wooden Patio Ideas

Backyard Decking Designs Small Backyard Decks Backyard Deck Design Backyard Decking Designs 20 Beautiful Backyard Wooden Patio Ideas

Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in the home and they are also the most expensive for renovate. Bathroom renovation is really a job that, if done well, can add value to some home along with a great space packed with design and lightweight.
20 Beautiful Backyard Wooden Patio Ideas

Bathroom design
Bathroom design could be the first part of your bathrooms renovation you need to get right. Just replacing the prevailing bathroom with the same design may not be enough. The key to great bathroom design is to design it using the people who will put it to use in your mind. However make sure that your bathroom design even offers a general use factor as well.

For example: If you were designing your bathrooms for families you might still design the toilet with comfortable access on the shower and bath. This would make sure that the design would also work if you have limited mobility. This means if you choose to sell your property or if you're renovating for profit your design has a wider market appeal. Great bathroom design also uses the area well, taking into account the light or window space, size fittings, and drainage options. Draw out an idea to scale and all the way down the sizes of your room. Mark the present drainage points then and water inlet points. Write down a wish list of the bathroom fittings to need and wish using sizes. Now marry both together and find out what fits. Note: Most bathroom drainage and water inlet points could be moved but this will come at extra cost.
Simple and Easy Backyard Privacy Ideas  MidCityEast

Bathroom remodel
If you have decided to complete the job yourself or part of the job it is time to engage a skip bin and retrieve that old bathroom. If your home appeared pre 1980 you may have fibro bathroom wall linings with asbestos inside it and great care will need to be taken. You will need some full body disposable overalls, eye protection, and quality dust mask. Check with the local building authority or council in connection with regulation on bathroom asbestos wall lining removal.
Remove everything except the plumbing. If you keep the restroom plumbing set up you will not have to turn the lake off for the complete house. Also you will have to jack hammer the ground tiles up and also the sand and cement bed they are laid on.
20 Unique Deck Designs That Break The Mold

Bathroom Renovation and construction
Bathrooms should be construction properly from the start to ensure that the finished job is correct and true. This also ensures the style and look of the lavatory can have a great finish
The Bathroom Renovation Process

Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and then install the bath hob and bath.

Waterproof the bottom and shower and bath recess.

Correct december the ground with sand and cement ready for tiling.

Lay floor and wall tiles then grout.

Install new bathroom vanity, fittings, and taps - install new electrical.
Small Deck Designs on Pinterest  Wood Deck Designs, Small Decks and Low Deck Designs


Paint ceiling and final  one - Plumbing and electrical
At this aspect new plumbing is installed for clean hot and cold water and drainage. Careful attention must be taken when positioning the modern plumbing so the plumbing fittings are correct if the tiling is fully gone. For example: To centre a fitting in a shower recess you have to think about the thickness in the wall board, tile glue and tile therefore the fitting will likely be centred as soon as the tiles are in position. The same pertains to installing drainage pipes for a toilet; the wall lining and tile thickness has to be considered so the pipe is within the correct position when the toilet is installed after tiling. Also rough inside the any new electrical wires without connecting them for the mains power.
1000+ ideas about Small Backyard Decks on Pinterest  Backyard decks, Small decks and Back deck

Step two - Install wall and ceiling linings
Install your 6mm wall lining being careful to nail the fibro board every 150mm without nailing into the new pipes and electrical wires. The best way would be to measure and mark the pipe and wire layout on your new wall board which has a pencil as you go. Screw up (or nail) the ceiling lining, plasterboard may be the most common. However if you might be laying your tiles from floor to ceiling tend not to install the cornice because this is done after tiling. If you might be not tiling for the ceiling proceed to install the cornice after the wallboard and ceiling lining are actually installed. Also if your bath is just not freestanding anyone can make up the frame and install the bathtub. Ensure the tub is installed correctly making it possible for the thickness from the tiles and  sure to check on all linings and pipes before you decide to continue with your bathrooms renovation.

Simple and Easy Backyard Privacy Ideas MidCityEast
20 Beautiful Backyard Wooden Patio Ideas

Step three - Waterproof a bath room
Waterproof your bathroom floor, shower recess, and around the tub. When waterproofing the bottom be sure that the waterproofing comes 100mm inside the walls. The shower recess must be waterproofed 100mm over the shower rose outlet. Also the bathtub must be waterproofed 100mm over the lip of the bath about and on the floor. At the doorway install a 25 x 25mm aluminum angle glued into place with quality silicone and waterproof into the lip. Your whole bathroom should now the tanked, so the all water will only go lower a drain. Bathroom waterproofing tip: waterproofing is an easy job but quality and accuracy is most crucial.
Step four - Lay within the cement screed for the bottom.

Before a floor tiles can laid the bottom have to be smooth and fairly flat which has a slight fall on the drainage outlet. To do this you must use sand and cement mix and it's also far better to put in a waterproofing agent into this at the same time. With a level, set the bottom level with the doorway. Use the top aluminum angle because finished floor level and measure along the thickness from the tile plus 10mm for the glue. Mark around the bathroom using a level after which screed in your sand and cement mix which has a 1 to 3 degree fall to the top with the drain outlet. Take your time and obtain it right with the finished level as smooth as possible. When the sand cement mix has set but is just not dry (you are able to walk on it but you it is a little soft) rub it over having a house brick. This will remove every one of the small highs and lows and check having a level while you go. Let the lavatory floor fully dry and after that you really should have an excellent surface to tile onto. Tip: greater work you put into a floor screed the more your tiling will probably be.
20 Unique Deck Designs That Break The Mold
Simple and Easy Backyard Privacy Ideas  MidCityEast

Step five: Tile floor and walls
Lay your tiles on the bottom first after which grout. Then lay your wall tiles ensuring that actually level when you lay. Once the lavatory tiles are actually cut and laid, grout your entire tiles then buff the tiles clean.
Step six: Install plumbing fitting and fixtures
Install all of your plumbing fittings and taps. Also fit all your towel rails and soap holders. Fit your brand-new bathroom vanity making certain it can be level and sealed across the top with silicone as well as seal around the bath. Tip: make sure they will be in the right place when you drill into the tiles.
Small Deck Designs on Pinterest Wood Deck Designs, Small Decks and Low Deck Designs
20 Unique Deck Designs That Break The Mold

Step seven: painting, and cleaning - enjoy
Paint your ceiling and do a final clean ensuring that things are fitted correctly knowning that there are no leaks within your plumbing. - Enjoy your brand-new bathroom.

Comments